Hallen furnished labor, material and equipment to install 11,000 FT of 12" steel gas transmission main piping. Activities included trench excavation, backfill, sheeting and shoring. In addition, work included tie-ins, valve and fitting installation, pressure tests, permanent asphalt and landscape restoration, the boring and jack casing of pipe across NYSDOT road and LIRR tracks.